Christian Hospital Bissamcuttack

Client: Christian Hospital, Bissamcuttack


Sustainable Integrated Design Expertise

Healthcare Sector

Bissamcuttack, Odisha Location


Spanning across 13.5 acres this 200 bedded health care facility has been designed to cater 72500 outpatients & 12000 inpatients annually. With its strategic location and facilities like 5 state of the art operation theatres equipped with advanced technology, this Hospital serves people around 200 KM radius serving 127000 people in 53 tribal villages in that locality.

Inspired by the unique culture and local architecture Ecofirst adopted ‘design through participation’ approach to ensure the needs and opinion of end users are met. The team of experts from different domain at Ecofirst striving for perfection in all aspects of the building's design to make it functionally and technically ahead of its time and context while expressing its humble characteristic through its look and feel.


Project details

  • Site area: 13.5 Acre
  • BUA (Sq. Ft): 97,000 Sq. Ft
  • Services Offered: Integrated Design Services
  • Project Status: Completed

Value Additions/Project Highlights

Master planning

  • Clear demarcation of zoning
  • Vehicular service accessibility to all facilities through loop road.

Architectural design

  • 200 bedded hospital with 5 OTs
  • Designed to adapt to site profile- all floors can be accessed directly from adjacent ground.
  • Climate responsive architecture
  • Universally accessible design
  • Designed to cater to the local culture and customs
  • Maximum natural lighting and ventilation
  • Separate waiting areas are distributed throughout the hospital to reduce congestion
  • Interconnecting corridors to connect all facilities

Landscape design

  • Introduction of landscape courtyards as waiting area
  • Separate community green space for residents and hospital visitors.

MEP Design

  • 100% power backup for essential facilities
  • Robust and flexible services infrastructure
  • 100% CCTV coverage
  • Fire detection and Suppression system
  • Centralized STP

Masterplanning

  • Clear demarcation of zoning
  • Vehicular service accessibility to all facilities through loop road.

Sustainability Goals include:

  • Climate responsive architecture
  • Sustainable Building Material and Construction Technology
  • Indoor Air Quality - toxicity/VOC free finishes
  • Centralized waste water and solid waste management